Heavy-duty floor slabs for warehouses, factories and industrial units across Sydney — poured in staged bays to tight flatness tolerances and engineered for forklift, racking and machinery loads.
A warehouse or factory floor is a heavy-duty, ground-bearing concrete slab built to carry industrial loads — forklift and vehicle traffic, racking and shelving legs, stored materials and fixed plant. It is designed and reinforced for far higher loads than a residential floor, and the surface finish and flatness are specified to suit how the floor will be used.
Everything is built to the structural engineer's design — slab thickness, reinforcement, concrete grade, joint layout and surface tolerance. On larger floors the slab is poured in planned bays with control joints set out to manage shrinkage and keep the building program moving.
With concrete construction experience across Greater Sydney since 2012, we form, reinforce, pour and finish industrial floor slabs to the documentation provided — managed by one team from set-out through to the cured floor.
What we account for when building a warehouse or factory floor.
Slab thickness and reinforcement are designed for the racking, forklift and machinery loads the floor has to carry — not a one-size-fits-all section.
We agree the required surface finish and flatness up front and pour and screed to it — important for forklift movement and narrow-aisle racking.
Large floors are poured in planned bays with construction and saw-cut control joints set out to manage shrinkage and keep your build moving.
Every floor is constructed to the structural engineer's design — thickness, reinforcement schedule, concrete specification and joint layout.
A sound, well-compacted subgrade is critical for an industrial floor. We prepare and level the base to the design before the steel goes down.
Set-out, base prep, steel fixing, the pour and the finish are all run by one team — one point of contact, accountable start to finish.
Three clear stages, one team accountable for every step.
We work from the structural engineer's plans — confirming slab thickness, reinforcement, concrete grade, joint layout and surface tolerance. The base is prepared and compacted, and the bays and joints are set out before any concrete is booked.
Perimeter and bay formwork is set, and the reinforcing steel is fixed to the engineer's schedule — bar sizes, spacings, laps and cover all to specification. Everything is checked against the drawings before the pour.
Concrete is placed bay by bay, screeded to the specified level and flatness, and finished to the agreed standard. Control joints are saw-cut at the right time and the slab is cured before handover.
See the full range of commercial and industrial concrete work we take on across Sydney, and how we run larger jobs.
View commercial concretingWarehouses usually need dock slabs, ramps and aprons too. See how we build loading docks for forklift and truck loads.
Explore loading docksWe build to the structural engineer's documentation for your site. If you don't yet have engineering, send us the building plans and we can advise on what's needed before the floor is quoted.
Every industrial floor is different — the engineered slab section, the required finish, the amount of base preparation and site access all affect the final number. Send us your plans and engineering, and we'll prepare a fixed-price quote. No deposit to quote, no obligation.
Fixed-price quote on your industrial floor slab — send us your plans and engineering and we'll get a number back to you.