Waffle pod and raft slabs for rebuilds, duplexes and granny flats across the Burwood Council area — Burwood, Burwood Heights, Croydon, Croydon Park and Enfield.
Burwood is one of the smallest council areas in Sydney and one of the most tightly built. Six suburbs, narrow street frontages, and neighbours close enough that the pour has to be planned around them rather than the other way round.
There is very little greenfield work here. Almost every slab we pour in Burwood is a rebuild, a duplex or a secondary dwelling going in behind a house that is still standing — which makes access, not ground, the first thing we look at.
Shale-derived reactive clay across most of the council area, with softer low-lying ground toward the Cooks River and a long history of filling on the older blocks.
Ashfield shale weathering to a reactive clay across the higher ground. Moderate to high reactivity is normal, so the engineer specifies stiffer edge beams or a raft rather than a shallow waffle.
Toward the Cooks River corridor the ground softens and alluvial material appears. Less reactive but less predictable, and the boreholes matter more than the map.
Inner-west blocks have been cut, filled and re-serviced repeatedly over a century. Uncontrolled fill and abandoned services both turn up in excavation, and the slab is designed around what is actually there.
These are the conditions we typically strike across Burwood — they are not a site classification. Your geotechnical report and structural engineer set the class and the slab design under AS 2870, and we quote and pour to whatever they specify.
Replacing older inner-west stock on narrow blocks. Tight set-out, close boundaries, and a pump line rather than a chute on nearly every one.
Where the block width allows it, dual occupancy is the highest-value use of a Burwood site. Party-wall footing and both dwellings set out off a single survey.
Back-yard secondary dwellings behind occupied houses. Access is the whole job — we work out the pump position and protect the existing driveway and services before we start.
Send us the engineering plans and we will confirm the system and quote it within 24 hours.
Polystyrene void formers in a grid, poured as one raft on top of the ground. Least excavation, least concrete, quickest to programme. The default on stable Class S and M sites.
Learn more →Solid concrete throughout with deeper stiffening beams dug into the ground. The system for reactive clay, fill and sloping sites where a waffle will not satisfy the engineer.
Learn more →A structural slab spanning between piers, walls or a lower level. Used on steep sites, over garages and basements, and for the upper floors of two-storey builds.
Learn more →We pour house slabs throughout the Burwood Council area, including:
Not listed? We cover the whole LGA — ask us about your suburb.
Email through the engineering drawings and the site classification, or just tell us the address and what you are building. We will come out and look at access, levels and the existing structures.
One price covering excavation, reinforcement, formwork, the pour and the paperwork. Pump access, rock and fill are priced in up front rather than raised as variations later.
We lock in a pour date around your inspections, set out to the engineer's drawings, pour and cure, and hand back a certified slab with the pour records for your building file.
All our concreting in the area: Concreters in Burwood · Nearby: Inner West, Strathfield, Canada Bay · All service areas
Send through your plans and we will have a fixed-price slab quote back to you within 24 hours.